Orders and invoices without the retyping, start to finish.

A made-up distributor puts its emailed purchase orders and vendor invoices through the whole method: the baseline, the readout, the install and the first quarter, with every figure shown.

Illustrative: a made-up company

The company, its numbers and its results are invented to show the method. Every figure on this page is illustrative math.

Most orders and every invoice get typed in by hand.

A made-up regional distributor of plumbing and HVAC supplies with three branches, an order desk of six and an accounts payable team of four. Customers email their purchase orders as PDFs, and about 140 vendors send invoices to one AP inbox.

The owner brought the order desk to the intro call. Orders were going out right, most days, but the desk kept growing with the business, and the typos surfaced at the dock.

The baseline counts the typing before anyone changes it.

The order desk supervisor and the controller timed the work for two weeks and pulled a month of volumes from the order inbox, the AP inbox and the ERP. Each figure carries how sure they were of it.

The baseline, one monthIllustrative math
What was countedHow sureBaseline
Customer purchase orders, keyed by handMeasured1,900
Lines on an average orderMeasured14
Minutes to key one orderMeasured9
Orders with an entry error found laterEstimated61
Cost to find and fix one entry errorEstimated$85
Vendor invoicesMeasured2,400
Minutes to key and match a routine invoiceMeasured6
Invoices that fail the matchMeasured432 (18%)
Minutes to resolve one exceptionEstimated22
Loaded cost of an hour, order desk and APMeasured$38
Early-pay discounts missedGuessa few thousand

Measured means read from a system’s own records. Estimated means counted by hand or taken from last year’s books. A guess is written down so nobody forgets it, and it stays out of the math.

Added up, the typing came to 683 hours a month: 285 on orders, 240 on routine invoices and 158 on exceptions. The error count comes from credit memos the team had tagged as entry errors, which is why it is an estimate. Orders that arrive by EDI from the two largest accounts were left out of every count above.

The readout sized the value at stake as a range.

The owner and the controller answered about twenty minutes of questions on a call, then connected the order inbox, the AP inbox and the ERP, read-only, after seeing exactly what would be read. StrikeArc Scout scored the plays in the library for fit against those answers. P06 Cut the manual work from orders and invoices came first, P08 Get quotes and contracts out faster second.

Before the 45-minute readout, one of our people sized the value at stake and signed every figure. The low case assumes 55% of orders and routine invoices go through without a touch. The high case assumes 75%, with exceptions resolved seven minutes faster because each one arrives with its evidence attached.

Value at stake, P06Illustrative math
Hours a month on orders and routine invoices525
Hours given back a month, low and high289 to 444
The same hours at $38 each, for a year$131,784 to $202,464
Entry errors avoided a month, low and high, at $85 each34 to 46
The errors avoided, for a year$34,680 to $46,920
Value at stake a year, low and high$166,464 to $249,384

The missed discounts stayed out: they were a guess. Hours given back are worth their loaded cost only when the time goes to other work, so the owner named that work before deciding: the past-due receivables and a backlog of vendor credits nobody had time to chase.

The readout’s do-not-build list had three lines, each with its reason.

  • Releasing payments. The play posts approved bills, and the controller still releases every payment run. Nothing reopens this one. Money leaving the bank stays a person’s decision.
  • The EDI orders. They already arrive as structured data, so there is nothing to retype. It reopens if either account moves to emailed orders.
  • Quotes for non-stock items, for now. P08 scored second. One play goes in at a time, measured against its baseline, so quotes wait for the second quarter.

The owner decided on the call to start with P06.

The install ran gate by gate.

The play went into the inboxes and the ERP the company already used. Nothing went live until the last gate.

Access

IT gave read access to both inboxes and to the ERP’s customers, items, prices, vendors, open purchase orders and receipts. Write access covered two record types only: sales orders and vendor bills. The order desk supervisor was named the one operator.

Rules

The controller set the tolerances for a match: price within 2%, quantities exact, freight under $75. Any bill over $5,000 waits for the controller, and any order line below its price floor waits for the inside sales lead.

Test

A month of past orders and invoices ran through the play side by side with what the team had keyed, and every difference was reviewed. The test can fail, and it did: one vendor billed in cases where the purchase order counted units, so the controller added a unit conversion to the rules.

Gate

The controller approved the tolerances and thresholds, and the owner approved the launch with the baseline attached.

Launch

Orders went live first. Vendor invoices followed once the supervisor had cleared the first batch of order exceptions.

The supervisor’s time across the install came to about two and a half hours, most of it on the side-by-side test. IT’s part was granting the access and checking its scope.

The first quarter shows up in the ledger.

The play reports the share of documents processed without a touch. The ledger turns that share into hours and errors, then into dollars.

The ledger, first quarterIllustrative math
What the play reportsBaselineQuarter
Customer orders processed without a touch0%56%
Vendor invoices processed without a touch0%60%
Minutes to resolve one exception2216
Orders with an entry error found later, a month6129
Hours given back in the quarter1,040
The same hours at $38 each$39,520
Entry errors avoided in the quarter, 96 at $85 each$8,160
Value this quarter, before the cost to run it$47,680
Less what the play cost to run this quarter: fees, usage and the hours spent checking its work$ ______
Net value this quarter, the figure a person signs$ ______

The cost to run comes from your own invoices and your team’s time records, so the example leaves those two lines blank.

A quarter at this rate runs to about $191,000 a year, inside the readout’s range. The hours went where the owner said they would: past-due receivables and vendor credits.

A person approved every step that mattered.

Every gate is a named human. Agents draft everything; they approve nothing. In this example the names are roles.

  • The controller set the tolerances, approves every bill over $5,000 and releases every payment run.
  • The inside sales lead approves any order line priced below its floor, with the line’s price history beside it.
  • The order desk supervisor clears the exceptions the play cannot match, each with the document and the reason attached.
  • The Value & Deployment Specialist and the owner signed each figure in the ledger before it was reported.

Some things did not change, for good reasons.

  • The exception rate. 18% of invoices still fail the match. The play sends each one to the right person with the evidence attached, which is why an exception takes 16 minutes where it took 22. The cause sits upstream: one branch records receipts a day or two late, so invoices arrive before the goods are on the books. That is a receiving habit, and the readout named it as the fix.
  • Payment runs. The controller releases every one, as before.
  • The EDI orders. Untouched, as the readout said.
  • The missed discounts. Nobody tracks vendor payment terms, so the guess stays a guess and the ledger counts none of them.

Run the same method on your own numbers.

The baseline above took two weeks of timing and a month of volumes. You can start the same count today.

Bring them to an intro call, and the readout starts from your numbers. How the capture, the matching and the approvals work with the ERP you already have is in invoice processing automation.

This example runs on one play.

The play in this example is P06 Cut the manual work from orders and invoices. It reports the share of documents processed without a touch, the first two lines of the ledger above.

  1. P06Cut the manual work from orders and invoicesSave time

How to get started

Bring a week of orders and invoices to a 30-minute call.

Book an intro call